A prefabricated drywall grid system is revolutionizing the soffit framing industry. Here’s how

  • 📰 IntEngineering
  • ⏱ Reading Time:
  • 40 sec. here
  • 2 min. at publisher
  • 📊 Quality Score:
  • News: 19%
  • Publisher: 63%

Österreich Nachrichten Nachrichten

Österreich Neuesten Nachrichten,Österreich Schlagzeilen

The jig table method for creating soffits is downright labor-intensive and requires a lot of material. Here's a simple solution to get it done faster!

When a new invention promises to be useful, it ought to be tried. - Thomas Jefferson

As foreman Jay Thomas explains, the work crew opted for the bend-and-click SimpleSoffit® mains with standard 50-inch cross tees to ditch the complex construction and get the required flange-to-flange opening. The result was a fast, consistent, repeatable installation that allowed E&K to see approximately three times the production of this soffit condition per day compared to traditional fabrication.

SimplesSoffit drywall grid also reduces the man-hours required in comparison to the steel stud’s method by 50%. Furthermore, it requires fewer people for assembly as it eliminates the onsite jig table. With a little pre-planning on ordering SimpleSoffit to your specific soffit dimensions, this prefabricated innovation helps accelerate onsite construction schedules.

Wir haben diese Nachrichten zusammengefasst, damit Sie sie schnell lesen können. Wenn Sie sich für die Nachrichten interessieren, können Sie den vollständigen Text hier lesen. Weiterlesen:

 /  🏆 287. in AT
 

Vielen Dank für Ihren Kommentar.Ihr Kommentar wird nach Prüfung veröffentlicht.

Österreich Neuesten Nachrichten, Österreich Schlagzeilen