This, together with reduced weekend demand, could help to ease the supply constraints.
The load shedding follows the manual tripping of Eskomโs Koeberg Unit 1 due to the increasing temperature on the secondary side of the plant.This entry was posted on 13 Mar 2020,05:17AM at 5:17 AM and is filed under
They are patting themselves on the back really, for destroying the country like this ๐๐๐๐
Loadshedding still continuing from 06:00,I'm sure cadres are very proud of their role in this country ๐๐๐๐๐
Loadshed proof your home
This stage 4 is reall really inconveniencing๐คฆโโ๏ธ
We already know coz you started before 5am already๐๐๐ด๐ People should wake the fcuk up and stop having amnesia next time TShirts and KFC chicken is flying all over the place. Mzansi is sinking worse everyday
Do we no longer have TREASONOUS ACTS?
Kaze kwakusukaphi ukuthi ngeke usabakhona load shedding
But why would it start at 5am mara, people my alarm ๐จ just when on and freakin loadshedding came up. This ainโt cool
Mhh SA is full of evil spirit
Then after that itโs stage 5