Thehas issued a boil-before-drink notice to its water consumers as it is introducing borehole-sourced water into the reticulation system.
The Metro says it is unable to meet the water quality standard blending ratio, set out for blending water from multiple sources. This is due to the low level of the supply dams, affecting abstraction rates and reservoir levels.
Nadat ek voordeel getrek het uit 'n weeklikse belegging, moet ek sê dat almal moet ophou val vir groot duisende, baie het belowe en misluk uit 'n honderd beleggings. MarkMaynardq is die beste. Jou inkomste hang af van jou kapitaal, handel met wie gewaarborg is van wins opbrengs.