Business, civic groups fear eThekwini won't cope when it goes back to high-level load shedding | News24

  • 📰 News24
  • ⏱ Reading Time:
  • 21 sec. here
  • 2 min. at publisher
  • 📊 Quality Score:
  • News: 12%
  • Publisher: 80%

مصر أخبار أخبار

مصر أحدث الأخبار,مصر عناوين

Civic society and Durban's most prominent business structures are concerned about the upgraded levels of load shedding eThekwini is set to face next week. | kaveels

On Tuesday, the municipality announced a revised load shedding schedule would be introduced from 25 May.

eThekwini was given a reprieve from load shedding with power only switched off from stages 4 upward for about a year, following the devastating April 2022 floods that claimed more than 360 lives.Get 14 days free to read all our investigative and in-depth journalism. Thereafter you will be billed R75 per month. You can cancel anytime and if you cancel within 14 days you won't be billed.

 

شكرًا لك على تعليقك. سيتم نشر تعليقك بعد مراجعته.
لقد قمنا بتلخيص هذا الخبر حتى تتمكن من قراءته بسرعة. إذا كنت مهتمًا بالأخبار، يمكنك قراءة النص الكامل هنا. اقرأ أكثر:

 /  🏆 4. in EG

مصر أحدث الأخبار, مصر عناوين

Similar News:يمكنك أيضًا قراءة قصص إخبارية مشابهة لهذه التي قمنا بجمعها من مصادر إخبارية أخرى.

'It can't be business as usual': Pupils tested in African languages performed poorly - study | News24The Department of Basic Education has voiced its concern about the poor performance of pupils evaluated in African home languages for the Progress in International Reading Literacy assessments. | YoliswaSobuwa
مصدر: News24 - 🏆 4. / 80 اقرأ أكثر »