Cuadrilla ‘ready to frack’ at second well in Lancashire as pressure on embattled industry builds

مصر أخبار أخبار

Cuadrilla ‘ready to frack’ at second well in Lancashire as pressure on embattled industry builds
مصر أحدث الأخبار,مصر عناوين

Letter from firm’s chief executive urges review of seismic limits on fracking operations

  • 📰 The Independent
  • ⏱ Reading Time:
  • 1 sec. here
  • 2 min. at publisher
  • 📊 Quality Score:
  • News: 4%
  • Publisher: 59%

to request permission to alter the type of hydraulic fracturing fluid it uses at its Preston New Road site to include more chemicals which will allow a greater quantity of sand to be pumped into the shale rock.

لقد قمنا بتلخيص هذا الخبر حتى تتمكن من قراءته بسرعة. إذا كنت مهتمًا بالأخبار، يمكنك قراءة النص الكامل هنا. اقرأ أكثر:

The Independent /  🏆 80. in EG
 

I'm ready to frack, willing to travel or can accommodate.

🔺 English Translation of N:aba 178 Editorial : 📜 || 'The Path of the Muja:hidin Towards Triumph and Empowerment' 🔸 BBMAsTopSocial 🔸 EarthDay 🔸

مصر أحدث الأخبار, مصر عناوين



Render Time: 2025-01-14 01:01:35