Owen Sound construction company fined $200,000 after worker critically injured

  • 📰 DCN_Canada
  • ⏱ Reading Time:
  • 22 sec. here
  • 2 min. at publisher
  • 📊 Quality Score:
  • News: 12%
  • Publisher: 74%

مصر أخبار أخبار

مصر أحدث الأخبار,مصر عناوين

Canada's construction news

OWEN SOUND, ONT. — Pickard Construction of Owen Sound, Ont. has been fined $200,000 after a worker was critically injured while clearing a blockage from a pipe near a live overhead hydro line in June 2022.

According to an Ontario news bulletin, on June 24, 2022, two workers were attempting to remove traceable mule tape from a previously buried high-density polyurethane pipe. HDPE pipes are pre-roped with traceable mule tape to help workers locate underground pipes after installation. The workers inserted the nozzle of a portable air compressor into the HDPE pipe and used air to blow a tangled mule tape blockage through it.

لقد قمنا بتلخيص هذا الخبر حتى تتمكن من قراءته بسرعة. إذا كنت مهتمًا بالأخبار، يمكنك قراءة النص الكامل هنا. اقرأ أكثر:

 /  🏆 17. in EG
 

شكرًا لك على تعليقك. سيتم نشر تعليقك بعد مراجعته.

مصر أحدث الأخبار, مصر عناوين