An elderly plasterer says Telstra and NBN cost him his business

  • 📰 9NewsAUS
  • ⏱ Reading Time:
  • 1 sec. here
  • 2 min. at publisher
  • 📊 Quality Score:
  • News: 4%
  • Publisher: 72%

Indonesia Berita Berita

Indonesia Berita Terbaru,Indonesia Berita utama

After forty-years the door slammed shut on the lifetime career of Canberra plasterer Bob Warner. 9News

 

Terima kasih atas komentar Anda. Komentar Anda akan dipublikasikan setelah ditinjau.

What do you expect from telstra there rating is weak and usless

NBN is the biggest con job ever 😠 Plans based on data and speed .backwards step Plans on 'normal, fast and fastest' speeds WTF 🙄 😱 backwards step. Previous ADSL and wireless network was faster and more reliable. the net will be shut down before they sort the NBN pooch screw 🤔

Berita ini telah kami rangkum agar Anda dapat membacanya dengan cepat. Jika Anda tertarik dengan beritanya, Anda dapat membaca teks lengkapnya di sini. Baca lebih lajut:

 /  🏆 10. in İD

Indonesia Berita Terbaru, Indonesia Berita utama

Similar News:Anda juga dapat membaca berita serupa dengan ini yang kami kumpulkan dari sumber berita lain.

With costs climbing to $20b, Metro West business case runs behindThe line is to run from Westmead through Parramatta and Olympic Park to the Bays Precinct at Rozelle and the central business district. Now Gladys is dreaming on Metro West when she has a big mess in George St Metro 1000s of traders ruined Cost overruns on Westconnex &Metro Just hopeless n she wants to build new stadiums as memorial obelisks of her largesse JakeSaulwick AndrewConstance It's NOT a metro, usually stops every km or so GladysB is building new stations in the CBD and still doesn't know how to connect to the 'Metro West'? Hopeless planning. Put the rail line into the WestConnex tunnel to prepare for the next oil crisis Why not fund CityRail so their signalling doesn’t keep breaking down?
Sumber: smh - 🏆 6. / 80 Baca lebih lajut »