Business, civic groups fear eThekwini won't cope when it goes back to high-level load shedding | News24

  • 📰 News24
  • ⏱ Reading Time:
  • 21 sec. here
  • 2 min. at publisher
  • 📊 Quality Score:
  • News: 12%
  • Publisher: 80%

Indonesia Berita Berita

Indonesia Berita Terbaru,Indonesia Berita utama

Civic society and Durban's most prominent business structures are concerned about the upgraded levels of load shedding eThekwini is set to face next week. | kaveels

On Tuesday, the municipality announced a revised load shedding schedule would be introduced from 25 May.

eThekwini was given a reprieve from load shedding with power only switched off from stages 4 upward for about a year, following the devastating April 2022 floods that claimed more than 360 lives.Get 14 days free to read all our investigative and in-depth journalism. Thereafter you will be billed R75 per month. You can cancel anytime and if you cancel within 14 days you won't be billed.

Berita ini telah kami rangkum agar Anda dapat membacanya dengan cepat. Jika Anda tertarik dengan beritanya, Anda dapat membaca teks lengkapnya di sini. Baca lebih lajut:

 /  🏆 4. in İD
 

Terima kasih atas komentar Anda. Komentar Anda akan dipublikasikan setelah ditinjau.

Indonesia Berita Terbaru, Indonesia Berita utama

Similar News:Anda juga dapat membaca berita serupa dengan ini yang kami kumpulkan dari sumber berita lain.

'It can't be business as usual': Pupils tested in African languages performed poorly - study | News24The Department of Basic Education has voiced its concern about the poor performance of pupils evaluated in African home languages for the Progress in International Reading Literacy assessments. | YoliswaSobuwa
Sumber: News24 - 🏆 4. / 80 Baca lebih lajut »