Tanzania’s Standard Gauge Railway: Most advanced, but victim of little private sector investment - The Africa Report.com

  • 📰 TheAfricaReport
  • ⏱ Reading Time:
  • 39 sec. here
  • 2 min. at publisher
  • 📊 Quality Score:
  • News: 19%
  • Publisher: 55%

Indonesia Berita Berita

Indonesia Berita Terbaru,Indonesia Berita utama

Concessional loans from the AfDB_Group are funding Tanzania’s advanced standard gauge railway project, highlighting the need for public sector involvement in closing Africa's infrastructure gap. Private sector investment still limited.

Tanzania’s standard gauge railway project – that seeks to open up quicker transport corridors towards the vast hinterland of Burundi, DRC, Rwanda, and Uganda – is the most advanced on the continent, but also a victim of a lack of private sector financing.

Just over a decade ago as he appeared on a panel at the World Economic Forum on Africa in Addis Ababa, the late Ethiopian Prime Minister Meles Zenawi was asked by journalist Robyn Curnow about the minor level of private investment in African infrastructure. “I am not surprised because the private sector can take risks up to a certain limit and they need sizable returns,” Zenawi responded. “Infrastructure is a high-risk business and therefore needs high returns. So it is very unlikely that the infrastructure gap in Africa is going to be filled by the private sector,” he said.we will wait another 30 years before the gap is filled

. [The] public sector has to come in and fill the gaps that cannot be filled by the private sector,” he said.

Berita ini telah kami rangkum agar Anda dapat membacanya dengan cepat. Jika Anda tertarik dengan beritanya, Anda dapat membaca teks lengkapnya di sini. Baca lebih lajut:

 /  🏆 29. in İD
 

Terima kasih atas komentar Anda. Komentar Anda akan dipublikasikan setelah ditinjau.

Indonesia Berita Terbaru, Indonesia Berita utama