Eskom to implement Stage 2 load shedding on Friday - SABC News - Breaking news, special reports, world, business, sport coverage of all South African current events. Africa's news leader.

  • 📰 SABC News Online
  • ⏱ Reading Time:
  • 32 sec. here
  • 2 min. at publisher
  • 📊 Quality Score:
  • News: 16%
  • Publisher: 51%

Indonesia Berita Berita

Indonesia Berita Terbaru,Indonesia Berita utama

Eskom to implement Stage 2 load shedding on Friday via SABCNewsOnline

Embattled power utility Eskom has said it cannot guarantee that load shedding will soon be a thing of the past.starting from 9am to 11 pm on Friday. The power utility implemented more power cuts this week as it struggled with capacity shortages. Eskom has suffered repeated faults at its coal-fired power stations, along with low water levels at hydro-electric plants and diesel shortages.

The situation worsened on Saturday last week after Eskom lost its electricity imports from the Cahora Bassa hydro-electric system in Mozambique, which contributes more than one-thousand megawatts to the SouthAfrican grid, after the powerful Cyclone Idai. Embattled power utility Eskom has said it cannot guarantee that load shedding will soon be a thing of past. However, Eskom Chairperson Jabu Mabuza vowed that measures have been put in place to avoid a total blackout.

Meanwhile, Public Enterprises Minister Pravin Gordhan appealed to South Africans to understand the nature of the challenges the power utility faces.

Berita ini telah kami rangkum agar Anda dapat membacanya dengan cepat. Jika Anda tertarik dengan beritanya, Anda dapat membaca teks lengkapnya di sini. Baca lebih lajut:

 /  🏆 32. in İD
 

Terima kasih atas komentar Anda. Komentar Anda akan dipublikasikan setelah ditinjau.

Indonesia Berita Terbaru, Indonesia Berita utama