Cuadrilla ‘ready to frack’ at second well in Lancashire as pressure on embattled industry builds

  • 📰 The Independent
  • ⏱ Reading Time:
  • 1 sec. here
  • 2 min. at publisher
  • 📊 Quality Score:
  • News: 4%
  • Publisher: 59%

Indonesia Berita Berita

Indonesia Berita Terbaru,Indonesia Berita utama

Letter from firm’s chief executive urges review of seismic limits on fracking operations

to request permission to alter the type of hydraulic fracturing fluid it uses at its Preston New Road site to include more chemicals which will allow a greater quantity of sand to be pumped into the shale rock.

 

Terima kasih atas komentar Anda. Komentar Anda akan dipublikasikan setelah ditinjau.

I'm ready to frack, willing to travel or can accommodate.

🔺 English Translation of N:aba 178 Editorial : 📜 || 'The Path of the Muja:hidin Towards Triumph and Empowerment' 🔸 BBMAsTopSocial 🔸 EarthDay 🔸

Berita ini telah kami rangkum agar Anda dapat membacanya dengan cepat. Jika Anda tertarik dengan beritanya, Anda dapat membaca teks lengkapnya di sini. Baca lebih lajut:

 /  🏆 80. in İD

Indonesia Berita Terbaru, Indonesia Berita utama