OWEN SOUND, ONT. — Pickard Construction of Owen Sound, Ont. has been fined $200,000 after a worker was critically injured while clearing a blockage from a pipe near a live overhead hydro line in June 2022.
According to an Ontario news bulletin, on June 24, 2022, two workers were attempting to remove traceable mule tape from a previously buried high-density polyurethane pipe. HDPE pipes are pre-roped with traceable mule tape to help workers locate underground pipes after installation. The workers inserted the nozzle of a portable air compressor into the HDPE pipe and used air to blow a tangled mule tape blockage through it.
Berita ini telah kami rangkum agar Anda dapat membacanya dengan cepat. Jika Anda tertarik dengan beritanya, Anda dapat membaca teks lengkapnya di sini. Baca lebih lajut: