Company says manufacturing problem was behind wind turbine blade breaking off Nantucket Island

  • 📰 AP
  • ⏱ Reading Time:
  • 25 sec. here
  • 18 min. at publisher
  • 📊 Quality Score:
  • News: 69%
  • Publisher: 51%

GE Vernova اخبار

Inc.,Design,General News

The maker of a massive wind turbine blade that broke apart off Nantucket Island says a manufacturing problem was responsible. GE Vernova, on a conference call Wednesday, said that insufficient bonding was the responsible for the blade coming apart and washing up on the beaches and that there was no indication of a design flaw.

NANTUCKET, Mass. — The maker of a massive wind turbine blade that broke apart off Nantucket Island and washed up on the beaches says a manufacturing problem was responsible.

“To identify deviations, we are going to go and do this on every blade. Prudent, thorough process,” he told the call. “We’re not going to talk about the timeline today. We have work to do. But I have a high degree of confidence that we can do this.” The federal Bureau of Safety and Environmental Enforcement said last week that operations at Vineyard Wind have been suspended until it can be determined whether the “blade failure” impacts other turbine blades on the development.

این خبر را خلاصه کرده ایم تا بتوانید سریع آن را بخوانید. اگر به خبر علاقه مند هستید، می توانید متن کامل را اینجا بخوانید. ادامه مطلب:

 /  🏆 728. in İR
 

از نظر شما متشکرم. نظر شما پس از بررسی منتشر خواهد شد.

ایران آخرین اخبار, ایران سرفصلها

Similar News:همچنین می توانید اخبار مشابهی را که از منابع خبری دیگر جمع آوری کرده ایم، بخوانید.

Farewell, Cedar Fair: Cedar Point, Kings Island parent company is now Six FlagsSix Flags said it was not planning any name or branding changes at any of the parks, including Cedar Point and Kings Island in Ohio.
منبع: clevelanddotcom - 🏆 301. / 63 ادامه مطلب »