Windsor company introduces revolutionary ‘Poo Pit’ manhole replacement shafts - constructconnect.com

  • 📰 DCN_Canada
  • ⏱ Reading Time:
  • 35 sec. here
  • 2 min. at publisher
  • 📊 Quality Score:
  • News: 17%
  • Publisher: 74%

日本 ニュース ニュース

日本 最新ニュース,日本 見出し

Notwithstanding its inauspicious name, the Poo Pit may revolutionize the installation of manholes and save municipalities everywhere a great deal of money. Daryl Rocheleau, owner of Windsor’s Shearock Construction Group and president of Quickstream Solut

QUICKSTREAM — Quickstream Solutions has three different size models of its manhole replacement shafts.

Seeing the technology at a trade show “my first inclination was why didn’t I think of that? Because it was simple and it would be cost effective,” Rocheleau said. “The air is bad, it’s a fall hazard,” Rocheleau says. “There’s disease and cockroaches. It’s not a safe place for humans.” By contrast Australian company Smartsteam Technology’s device is a “completely sealed system,” and doesn’t allow water to infiltrate.

In terms of manufacturing, after his firm gets the engineered drawings “it’s usually a couple of weeks we can have it out the door.”“In certain cases when you have multiple pipes cut it makes more sense to have absolutely better access,” he says.

このニュースをすぐに読めるように要約しました。ニュースに興味がある場合は、ここで全文を読むことができます。 続きを読む:

 /  🏆 17. in JP
 

コメントありがとうございます。コメントは審査後に公開されます。

日本 最新ニュース, 日本 見出し