State nuclear company needs to be ‘reshaped’ amid crisis, MPs hear

  • 📰 BDliveSA
  • ⏱ Reading Time:
  • 32 sec. here
  • 2 min. at publisher
  • 📊 Quality Score:
  • News: 16%
  • Publisher: 63%

日本 ニュース ニュース

日本 最新ニュース,日本 見出し

The Nuclear Energy Corporation of SA made a loss over the past two years, with the IRP unlikely to include nuclear energy as a future requirement

The Pelindaba nuclear reactor plant near Pretoria. Picture: THE TIMES

Necsa CEO Kelvin Kemm and the previous board were suspended by energy minister Jeff Radebe in November. Kemm and two board members are challenging their suspension in court. Although the new Integrated Resource Plan , SA’s long-term energy plan, has not yet been finalised, drafts anticipate that no new nuclear energy capacity will be required in the foreseeable future.

NTP Radioisotopes, Necsa’s most successful commercial subsidiary, was closed by the National Nuclear Regulator between November 2017 and November 2018 over safety concerns. It is one of only four manufacturers of medical isotopes in the world.

 

コメントありがとうございます。コメントは審査後に公開されます。

Please don't tell me the ANC have their numbskulls running our nuclear power plants too..

このニュースをすぐに読めるように要約しました。ニュースに興味がある場合は、ここで全文を読むことができます。 続きを読む:

 /  🏆 12. in JP

日本 最新ニュース, 日本 見出し