Building ships in the Glasgow rain will soon become a thing of the past thanks to a gigantic building project on the Clyde.
And it means HMS Cardiff - currently being assembled outdoors on the yard's hardstanding - will be the last ship to be built in Govan while exposed to the elements. It will include two 100-tonne cranes to lift materials in place and two 20-tonne cranes operating at lower heights.
このニュースをすぐに読めるように要約しました。ニュースに興味がある場合は、ここで全文を読むことができます。 続きを読む: