The Metals Company Announces Successful Trial Of Its Riser Pipe & Jumper Hose

  • 📰 cleantechnica
  • ⏱ Reading Time:
  • 48 sec. here
  • 2 min. at publisher
  • 📊 Quality Score:
  • News: 23%
  • Publisher: 51%

대한민국 뉴스 뉴스

대한민국 최근 뉴스,대한민국 헤드 라인

The Metals Company and Allseas announced the successful deepwater commissioning of its riser pipe and jumper hose.

The Metals Company and Allseas have announced the successful deepwater commissioning of its riser pipe and jumper hose. These tools are designed to lift polymetallic nodules from the seafloor to the surface. The nodules typically fit inside the palm of your hand .

Once the sub-sea connection was made, Allseas then used a derrick that was previously used for at-sea construction of the pilot riser system that extends to 4 kilometers deep. There are plans to deploy it later this year in the Clarion Clipperton Zone of the Pacific Ocean.The Metals Company said that the pilot system being tested by Allseas will be the basis for its first commercial production system. Inannounced by both companies, they outlined the terms for developing and operating the system.

These nodules have high grades of nickel, manganese, copper, and cobalt, which are key for building EV batteries and other renewable energy technologies. The Metals Company noted that the development of technologies to collect polymetallic nodules started in the 1970s when oil, gas, and mining companies such as Shell and Sumitomo were able to successfully conduct a pilot test in the CCZ. They collected over 10,000 tons of nodules.

 

귀하의 의견에 감사드립니다. 귀하의 의견은 검토 후 게시됩니다.
이 소식을 빠르게 읽을 수 있도록 요약했습니다. 뉴스에 관심이 있으시면 여기에서 전문을 읽으실 수 있습니다. 더 많은 것을 읽으십시오:

 /  🏆 565. in KR

대한민국 최근 뉴스, 대한민국 헤드 라인