Company says manufacturing problem was behind wind turbine blade breaking off Nantucket Island

  • 📰 AP
  • ⏱ Reading Time:
  • 25 sec. here
  • 18 min. at publisher
  • 📊 Quality Score:
  • News: 69%
  • Publisher: 51%

GE Vernova 뉴스

Inc.,Design,General News

The maker of a massive wind turbine blade that broke apart off Nantucket Island says a manufacturing problem was responsible. GE Vernova, on a conference call Wednesday, said that insufficient bonding was the responsible for the blade coming apart and washing up on the beaches and that there was no indication of a design flaw.

NANTUCKET, Mass. — The maker of a massive wind turbine blade that broke apart off Nantucket Island and washed up on the beaches says a manufacturing problem was responsible.

“To identify deviations, we are going to go and do this on every blade. Prudent, thorough process,” he told the call. “We’re not going to talk about the timeline today. We have work to do. But I have a high degree of confidence that we can do this.” The federal Bureau of Safety and Environmental Enforcement said last week that operations at Vineyard Wind have been suspended until it can be determined whether the “blade failure” impacts other turbine blades on the development.

이 소식을 빠르게 읽을 수 있도록 요약했습니다. 뉴스에 관심이 있으시면 여기에서 전문을 읽으실 수 있습니다. 더 많은 것을 읽으십시오:

 /  🏆 728. in KR
 

귀하의 의견에 감사드립니다. 귀하의 의견은 검토 후 게시됩니다.

대한민국 최근 뉴스, 대한민국 헤드 라인

Similar News:다른 뉴스 소스에서 수집한 이와 유사한 뉴스 기사를 읽을 수도 있습니다.

Farewell, Cedar Fair: Cedar Point, Kings Island parent company is now Six FlagsSix Flags said it was not planning any name or branding changes at any of the parks, including Cedar Point and Kings Island in Ohio.
출처: clevelanddotcom - 🏆 301. / 63 더 많은 것을 읽으십시오 »