Eskom laments continued damage to infrastructure - SABC News - Breaking news, special reports, world, business, sport coverage of all South African current events. Africa's news leader.

  • 📰 SABCNews
  • ⏱ Reading Time:
  • 14 sec. here
  • 2 min. at publisher
  • 📊 Quality Score:
  • News: 9%
  • Publisher: 51%

Россия Новости Новости

Россия Последние новости,Россия Последние новости

Eskom in Gauteng has voiced concern over the continued cost of fixing mini-substations and transformers due to failed electricity equipment during rolling blackouts. Eskom loadshedding rollingblackouts

A technician wearing a protective suit works on a live 250 000 high voltage power line of a RTE electrical substation in Grande-Synthe, France, July 1, 2021.A technician wearing a protective suit works on a live 250 000 high voltage power line of a RTE electrical substation in Grande-Synthe, France, July 1, 2021.

Eskom’s Senior Manager for Maintenance and Operations in Gauteng Mashangu Xivambu says, “It does cost a fortune to fix equipment that are failing. But most of our equipment failures are attributed to abuse of the infrastructure where our networks are overloaded.”

 

Спасибо за ваш комментарий. Ваш комментарий будет опубликован после проверки

What did the MAMPARAS expect? Eskom_SA

Мы обобщили эту новость, чтобы вы могли ее быстро прочитать.Если новость вам интересна, вы можете прочитать полный текст здесь Прочитайте больше:

 /  🏆 37. in RU

Россия Последние новости, Россия Последние новости