Eskom hands control of load shedding back to Ekurhuleni | Business

  • 📰 News24
  • ⏱ Reading Time:
  • 24 sec. here
  • 2 min. at publisher
  • 📊 Quality Score:
  • News: 13%
  • Publisher: 80%

Sverige Nyheter Nyheter

Sverige Senaste nytt,Sverige Rubriker

Eskom has returned control of load shedding back to the City of Ekurhuleni less than a week after it took over when the municipality failed to implement power cuts. | News24_Business

Eskom announced on Wednesday that it had taken control. It had previously taken over some of the role and left the municipality to load shed substations that had"critical loads". It later handed back all load shedding after the municipality asked to assume responsibility again.

"We are an economic hub and therefore, we are looking forward to positive engagements with the power utility, bearing in mind the valuable contribution of industry to the economy," Dlamini said. In times of uncertainty you need journalism you can trust. For 14 free days, you can have access to a world of in-depth analyses, investigative journalism, top opinions and a range of features. Journalism strengthens democracy. Invest in the future today.

Vi har sammanfattat den här nyheten så att du kan läsa den snabbt. Om du är intresserad av nyheterna kan du läsa hela texten här. Läs mer:

 /  🏆 4. in SE
 

Tack för din kommentar. Din kommentar kommer att publiceras efter att ha granskats.

Sverige Senaste nytt, Sverige Rubriker