Eskom laments continued damage to infrastructure - SABC News - Breaking news, special reports, world, business, sport coverage of all South African current events. Africa's news leader.

  • 📰 SABCNews
  • ⏱ Reading Time:
  • 14 sec. here
  • 2 min. at publisher
  • 📊 Quality Score:
  • News: 9%
  • Publisher: 51%

الإمارات العربية المتحدة أخبار أخبار

الإمارات العربية المتحدة أحدث الأخبار,الإمارات العربية المتحدة عناوين

Eskom in Gauteng has voiced concern over the continued cost of fixing mini-substations and transformers due to failed electricity equipment during rolling blackouts. Eskom loadshedding rollingblackouts

A technician wearing a protective suit works on a live 250 000 high voltage power line of a RTE electrical substation in Grande-Synthe, France, July 1, 2021.A technician wearing a protective suit works on a live 250 000 high voltage power line of a RTE electrical substation in Grande-Synthe, France, July 1, 2021.

Eskom’s Senior Manager for Maintenance and Operations in Gauteng Mashangu Xivambu says, “It does cost a fortune to fix equipment that are failing. But most of our equipment failures are attributed to abuse of the infrastructure where our networks are overloaded.”

 

شكرًا لك على تعليقك. سيتم نشر تعليقك بعد مراجعته.

What did the MAMPARAS expect? Eskom_SA

لقد قمنا بتلخيص هذا الخبر حتى تتمكن من قراءته بسرعة. إذا كنت مهتمًا بالأخبار، يمكنك قراءة النص الكامل هنا. اقرأ أكثر:

 /  🏆 37. in AE

الإمارات العربية المتحدة أحدث الأخبار, الإمارات العربية المتحدة عناوين