Canadian energy company leaves debris in Michigan, delays report

  • 📰 CTVNews
  • ⏱ Reading Time:
  • 22 sec. here
  • 2 min. at publisher
  • 📊 Quality Score:
  • News: 12%
  • Publisher: 99%

مصر أخبار أخبار

مصر أحدث الأخبار,مصر عناوين

A Canadian-based energy transportation company's preparation of a proposed tunnel that would house a petroleum pipeline caused a borehole to collapse in Michigan, which left debris in the waterway.

Petosky News-Review reported.

The tunnel would enclose the Straits of Mackinac's portion of the 66-year-old pipeline, which is also known as Enbridge Line 5. It runs from Superior, Wisconsin to Sarnia, Ontario. Duffy added that the debris does not pose any inherent safety or environmental risk. But the presence of the debris means that Enbridge is in violation of their boring permit under the Natural Resources Environmental Protection Act.

 

شكرًا لك على تعليقك. سيتم نشر تعليقك بعد مراجعته.
لقد قمنا بتلخيص هذا الخبر حتى تتمكن من قراءته بسرعة. إذا كنت مهتمًا بالأخبار، يمكنك قراءة النص الكامل هنا. اقرأ أكثر:

 /  🏆 1. in EG

مصر أحدث الأخبار, مصر عناوين

Similar News:يمكنك أيضًا قراءة قصص إخبارية مشابهة لهذه التي قمنا بجمعها من مصادر إخبارية أخرى.

Carl Icahn urges HP shareholders to press for Xerox mergerCalling HP’s standalone restructuring plan as ‘rearranging the deck chairs on the Titanic,’ Icahn said the company’s refusal could be a delay tactic to hold the ‘lucrative’ positions of its executives
مصدر: globeandmail - 🏆 5. / 92 اقرأ أكثر »