Stage 4 load shedding set to continue until late Friday - SABC News - Breaking news, special reports, world, business, sport coverage of all South African current events. Africa's news leader.

  • 📰 SABC News Online
  • ⏱ Reading Time:
  • 12 sec. here
  • 2 min. at publisher
  • 📊 Quality Score:
  • News: 8%
  • Publisher: 51%

日本 ニュース ニュース

日本 最新ニュース,日本 見出し

Eskom says that Stage 4 load shedding will continue until Friday evening.

This, together with reduced weekend demand, could help to ease the supply constraints.

The load shedding follows the manual tripping of Eskom’s Koeberg Unit 1 due to the increasing temperature on the secondary side of the plant.This entry was posted on 13 Mar 2020,05:17AM at 5:17 AM and is filed under

 

コメントありがとうございます。コメントは審査後に公開されます。

They are patting themselves on the back really, for destroying the country like this 👏👏👏👏

Loadshedding still continuing from 06:00,I'm sure cadres are very proud of their role in this country 👏👏👏👏👏

Loadshed proof your home

This stage 4 is reall really inconveniencing🤦‍♀️

We already know coz you started before 5am already😒😒😴😒 People should wake the fcuk up and stop having amnesia next time TShirts and KFC chicken is flying all over the place. Mzansi is sinking worse everyday

Do we no longer have TREASONOUS ACTS?

Kaze kwakusukaphi ukuthi ngeke usabakhona load shedding

But why would it start at 5am mara, people my alarm 🚨 just when on and freakin loadshedding came up. This ain’t cool

Mhh SA is full of evil spirit

Then after that it’s stage 5

このニュースをすぐに読めるように要約しました。ニュースに興味がある場合は、ここで全文を読むことができます。 続きを読む:

 /  🏆 32. in JP

日本 最新ニュース, 日本 見出し