Windsor company introduces revolutionary ‘Poo Pit’ manhole replacement shafts - constructconnect.com

  • 📰 DCN_Canada
  • ⏱ Reading Time:
  • 35 sec. here
  • 2 min. at publisher
  • 📊 Quality Score:
  • News: 17%
  • Publisher: 74%

Россия Новости Новости

Россия Последние новости,Россия Последние новости

Notwithstanding its inauspicious name, the Poo Pit may revolutionize the installation of manholes and save municipalities everywhere a great deal of money. Daryl Rocheleau, owner of Windsor’s Shearock Construction Group and president of Quickstream Solut

QUICKSTREAM — Quickstream Solutions has three different size models of its manhole replacement shafts.

Seeing the technology at a trade show “my first inclination was why didn’t I think of that? Because it was simple and it would be cost effective,” Rocheleau said. “The air is bad, it’s a fall hazard,” Rocheleau says. “There’s disease and cockroaches. It’s not a safe place for humans.” By contrast Australian company Smartsteam Technology’s device is a “completely sealed system,” and doesn’t allow water to infiltrate.

In terms of manufacturing, after his firm gets the engineered drawings “it’s usually a couple of weeks we can have it out the door.”“In certain cases when you have multiple pipes cut it makes more sense to have absolutely better access,” he says.

 

Спасибо за ваш комментарий. Ваш комментарий будет опубликован после проверки
Мы обобщили эту новость, чтобы вы могли ее быстро прочитать.Если новость вам интересна, вы можете прочитать полный текст здесь Прочитайте больше:

 /  🏆 17. in RU

Россия Последние новости, Россия Последние новости