Eskom has taken over load shedding in the City of Ekurhuleni , saying the municipality failed to implement power cuts.
Eskom had previously taken over some of the role, with the municipality left to load shed substations with"critical loads". Eskom later handed over all load shedding to the municipality after it asked to assume responsibility again. "Failure to implement load shedding by municipalities affects the integrity and stability of the grid, which may lead to higher stages of load shedding."
المملكة العربية السعودية أحدث الأخبار, المملكة العربية السعودية عناوين
Similar News:يمكنك أيضًا قراءة قصص إخبارية مشابهة لهذه التي قمنا بجمعها من مصادر إخبارية أخرى.
مصدر: News24 - 🏆 4. / 80 اقرأ أكثر »