Business, civic groups fear eThekwini won't cope when it goes back to high-level load shedding | News24

  • 📰 News24
  • ⏱ Reading Time:
  • 21 sec. here
  • 2 min. at publisher
  • 📊 Quality Score:
  • News: 12%
  • Publisher: 80%

Sverige Nyheter Nyheter

Sverige Senaste nytt,Sverige Rubriker

Civic society and Durban's most prominent business structures are concerned about the upgraded levels of load shedding eThekwini is set to face next week. | kaveels

On Tuesday, the municipality announced a revised load shedding schedule would be introduced from 25 May.

eThekwini was given a reprieve from load shedding with power only switched off from stages 4 upward for about a year, following the devastating April 2022 floods that claimed more than 360 lives.Get 14 days free to read all our investigative and in-depth journalism. Thereafter you will be billed R75 per month. You can cancel anytime and if you cancel within 14 days you won't be billed.

 

Tack för din kommentar. Din kommentar kommer att publiceras efter att ha granskats.
Vi har sammanfattat den här nyheten så att du kan läsa den snabbt. Om du är intresserad av nyheterna kan du läsa hela texten här. Läs mer:

 /  🏆 4. in SE

Sverige Senaste nytt, Sverige Rubriker

Similar News:Du kan också läsa nyheter som liknar den här som vi har samlat in från andra nyhetskällor.

'It can't be business as usual': Pupils tested in African languages performed poorly - study | News24The Department of Basic Education has voiced its concern about the poor performance of pupils evaluated in African home languages for the Progress in International Reading Literacy assessments. | YoliswaSobuwa
Källa: News24 - 🏆 4. / 80 Läs mer »